Mobile
Log In Sign Up
Home > english-chinese > "top flange" in Chinese

Chinese translation for "top flange"

上翼缘

Related Translations:
can end flange:  罐身翻边
topping unit:  顶索定位装置切顶器
top draining:  地表排水
permanent top:  固定炉盖
recombed top:  复精梳毛条
top slat:  车顶铰接机构
right top:  右上部显示
top packer:  顶部打捆器
top loading:  顶部加压顶加载自顶装入
top boot:  长统马靴
Example Sentences:
1.At the top flange there would be enough slack so that no relative twist of any significant magnitude would be introduced into the girder web .
在上翼缘处有足够的松动,因而在主梁腹板上并不会引起很大的相对扭转。
2.Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection .
肉眼观察表明:在端节点处的系梁和横梁上翼缘之间产生一种沿桥梁纵向的水平位移。
3.Assure both mounting base of gear operator ( 3 ) and valve top flange ( 6 ) are clean and dry
确保齿轮操作机构( 3 )和阀门顶部法兰( 6 )的安装基座清洁并且干燥。
4.Secure gear operator ( 3 ) to valve top flange ( 6 ) using a minimum of two supplied fasteners ( 7 & 8 )
用至少两个支撑紧固件( 7和8 )将齿轮操作机构( 3 )紧固在阀门的顶部法兰( 6 )上。
5.This paper researches the plane stiffness of new composite structure for slab on the lower flange , which is compared with the traditional structure for the slab on the top flange
本文研究了将楼板置于钢梁下翼缘的新型组合结构平面刚度,并和传统的将楼板置于钢梁上翼缘的结构形式的平面刚度和极限承载力作了比较。
6.Plastic theory suggests , the composite beam for the floorslab is suited lower flange , it s plastic limit moment cuts down by 52 . 4 % than the composite beam for the floorslab is suited on the top flange . it s plastic limit moment lifts 8 . 8 % than the steel beam , which is on the same condition
塑性理论分析的结果表明,楼板位于钢梁下翼缘形式的组合梁和楼板位于钢梁上翼缘形式的组合梁截面相比较,其塑性极限弯矩降低52 . 4 ,和同等条件下纯钢梁截面相比较,楼板位于钢梁下翼缘的组合梁塑性极限弯矩提高8 . 8 。
7.Elastic theory and plastic theory are adopted in the analysis of the two section composite beam . elastic theory suggests , on the condition of the same steel beam section size , the composite beam for the floorslab is suited lower flanges convertion section stiffness cuts down by 75 . 1 % , elastic limit bending resistant capability cuts down by 47 . 9 % , than the composite beam for the floorslab is suited on the top flange . it s conversion section stiffness is lifted 8 . 0 % , elastic limit bending resistant capability is lifted 0 . 20 % , than the steel beam
弹性理论分析的结果表明,在钢梁截面大小相同的条件下,楼板位于钢梁下翼缘的组合梁和楼板位于钢梁上翼缘的组合梁相比,其换算截面刚度降低75 . 1 ,梁的弹性极限抗弯承载力降低47 . 9 ,楼板位于钢梁下翼缘的组合梁和纯钢梁相比,其换算截面刚度提高8 . 0 ,梁的弹性极限抗弯承载力提高0 . 2 。
Similar Words:
"top financial management" Chinese translation, "top finish" Chinese translation, "top finishing" Chinese translation, "top firing" Chinese translation, "top five international corp" Chinese translation, "top flange plate" Chinese translation, "top flash" Chinese translation, "top flask" Chinese translation, "top flicker" Chinese translation, "top flight" Chinese translation